Engine
| Model | QR25DE | |
| Type | Gasoline, 4-cycle, DOHC | |
| Cylinder arrangement | 4-cylinder | |
| Bore x Stroke |
in (mm) |
3.5 x 3.9 (89.0 x 100.0) |
| Displacement |
cu in (cm3) |
151.82 (2,488) |
| Firing order | 1-3-4-2 | |
| Idle speed | No adjustment is necessary. | |
| CVT (in “N” position) | ||
| Ignition timing (degree B.T.D.C. at idle speed) | ||
| CO % at idle | ||
| Spark plug | FXE20HE-11C | |
| Spark plug gap (Nominal) |
in (mm) |
0.043 (1.1) |
| Camshaft operation | Timing chai | |
This spark ignition system complies with the Canadian standard ICES-002
Wheels and tires

Dimensions and weights

Air conditioner system refrigerant and oil recommendations
When traveling or registering your vehicle in
another countryCVT position
Inspection
Turn ON the ignition switch with the shift selector at the “P” position.
Press the shift selector button with the brake pedal depressed,
and confirm that the shift selector can be
moved to positions other than “P”. Also confirm that movement is not allowed
from ...
Meter buzzer circuit
Description
The buzzer for the warning chime system is installed in the combination
meter.
The combination meter sounds the buzzer based on the signals transmitted
from various units.
Component Function Check
1. CHECK OPERATION OF METER BUZZER
Select "BUZZER" of & ...
CVT control system
Wiring Diagram
...